The Main Avenue Streetscape and Downtown Commons improvements will be implemented to enhance downtown Twin Falls and support economic development and revitalization. Improvements will include:

  • New sidewalks and paving from street curbs to building faces
  • New street paving and storm drainage facilities
  • Upgraded and expanded street lighting
  • New street trees with better visibility of business signs and store fronts
  • New landscaping and irrigation
  • Festival street areas designed for special events
  • Downtown Commons (Rogerson site): new splash pad (spray play area), concert area, and public restrooms

The project is generally being funded through the Twin Falls Urban Renewal Agency to enhance Downtown for redevelopment and economic revitalization. Main Avenue will be improved for five blocks, from Fairfield Street to Jerome Street. The Hansen Street extension will connect between 2nd Avenue E to 2nd Avenue S, which will enhance access to available parking in the Downtown and enhance vehicle, cyclist, and pedestrian connectivity to destinations north and south of Main Avenue. The Downtown Commons improvements will create a new signature public plaza at the Rogerson site in the heart of Twin Falls. More details related to these planned improvements are listed below.

It is anticipated that the project elements for this contract will be constructed in two phases, and a third phase will cover work for the separate utilities/alley way work.

Main Avenue Reconstruction—Five Blocks

  • Full roadway demolition and reconstruction (asphalt) for the five blocks of Main Avenue between Fairfield and Jerome
  • New curb, gutter, valley gutter, sidewalks (concrete), landscape/furnishings zone and curb bulbs/extensions at intersections
  • Raised mid-block crossings
  • Colored unit pavers in furnishings zones and for accent on Main Avenue
  • Street trees and landscaping (includes soil/ irrigation)
  • Furnishings (tree grates, bollards, trash/recycling receptacles, benches, etc. for the streetscape)
  • All pedestrian scale street lights replaced with similar design pole and fixture for the purpose of improving lighting conditions for pedestrians and with energy-efficient LED technology; secondary electrical circuit with outlets for events
  • New stormwater drainage system/improvements
  • Structural/water proofing details for underground vaults, basements, and coal chutes in the public right-of-way as applicable

Main Avenue Festival Street West of Hansen

  • To half block in front of Downtown Commons
  • Raised concrete street with bollards and furnishings (see list above under Main Avenue)
  • Landscape, trees, irrigation
  • Stormwater drainage improvements
  • Illumination—pedestrian scale lighting

Main Avenue Festival Street West of Shoshone

  • To half block in Front of Paris Building
  • Raised concrete street with bollards and furnishings (see list above under Main Avenue)
  • Landscape, trees, irrigation
  • Stormwater drainage improvements
  • Illumination—pedestrian scale lighting

Hansen Street Extension South to Parking Area

  • Extension from Main southerly, across alleyway, and to parking area and reconstruction to create a new roadway accessing the parking area (new asphalt, curb, gutter, and sidewalk)
  • Illumination—pedestrian scale lighting
  • Landscape, trees, irrigation
  • Stormwater drainage improvements
  • Furnishings (see list above under Main Avenue)

Hansen Festival Street between Downtown Commons and New City Hall

  • From Main Avenue North to Alley Way (Adjacent to Downtown Commons) and Raised Intersection at Hansen and Main
  • Raised concrete street with bollards and furnishings (see list above under Main Avenue)
  • Stormwater drainage improvements
  • Landscape, trees, irrigation
  • Illumination—pedestrian scale lighting

Hansen Street Roadway Segments North and South to the 2nd Avenues

  • New curb, gutter, sidewalk, north of Downtown Commons to 2nd Avenue E.
  • New roadway, curb, gutter, and sidewalk from parking area to the south to 2nd Ave. S.
  • Curb bulbs/extensions all four corners at both 2nd Avenue intersections
  • Stormwater drainage improvements
  • Landscape, trees, irrigation
  • Illumination—pedestrian scale lighting

Downtown Commons Plaza

  • Basic concrete paving and installation of donated bricks; and some special paving around spray play feature of 12,500 square-foot plaza area
  • Public restroom building
  • Lighting and electrical hook-ups
  • Spray play area with recirculation system
  • Trees and landscaping
  • Architectural trellis elements/screening and aesthetic treatment along blank wall
  • Stormwater drainage improvements

Utilities Replacement and Pavement Resurfacing in the Alley Ways

  • Replacement and upgrades of utilities in the alley ways (ten blocks) between Fairfield and Jerome – both sides of Main Avenue. Upgrades to water, sewer, stormwater, electrical, natural gas, communications anticipated.
  • Replacement and upgrades continuing for water and sewer where needed in the alleyway between Jerome and Ketchum in Ketchum to Main Avenue and in Main Avenue from Ketchum to Liberty
  • Repaving of the alley way surfaces in asphalt.
  • Replacement of sewer in Shoshone Street.

Alley Way Landscape, Irrigation, and General Clean Up between Gooding and Idaho Streets

  • Design of new landscaping, irrigation, and general clean up of alley ways from Gooding to Idaho, on both sides of Main Avenue
  • Paving, stormwater drainage, illumination design improvements also are in process.